home *** CD-ROM | disk | FTP | other *** search
/ Eagles Nest BBS 4 / Eagles_Nest_Mac_Collection_Disc_4.TOAST / General Business / PropertAn309 / REAL ESTATE / Property Analysis 3.09.rsrc / STR#_51.txt < prev    next >
Text File  |  1990-01-19  |  2KB  |  49 lines

  1.  
  2.  
  3. Enter the month and year (mm/yy) that the construction loan will start for the new building. The difference between this date and the Occupancy Date is used to calculate interest paid during construction.
  4.  
  5. Select this button if the project is a non-residential building. This is used in determining the depreciation rate for tax calculations.
  6.  
  7. Select this button if the project is a residential building. This is used in determining the depreciation rate for tax calculations.
  8.  
  9. Select this button if you are considering a new building. You will be asked for information related to construc- ting the building, such as cost/ sq. ft. and terms for construction loans.
  10.  
  11. Select this button if you are considering a building that has already been constructed.
  12.  
  13. !51,22
  14.  
  15. !51,21
  16.  
  17. This is the name of the current REM file. Use Save As‚Ķ if you wish to change it, or Close (‚åòK) and Open‚Ķ (‚åòO) to change to another file. Look at About REM... under the Ô£ø to see how much memory remains.
  18.  
  19. Click on  this icon to close this window and open the next one. You may also use Next Window under the Windows menu (‚åòN).
  20.  
  21. Enter the total area of the building that is actually being contracted for use. Hallways and bathrooms are examples of non-leasable area.
  22.  
  23. Enter the total area of the building. This number is used to compute the cost of constructing a new building.
  24.  
  25. If this project is a new building, enter the month and year that construction will be completed, otherwise use the month and year that you will take over ownership. Format is mm/yy.
  26.  
  27. Enter the name of the project.
  28.  
  29.  
  30.  
  31. Enter the address of the project site.  Include a phone number if it is appropriate.
  32.  
  33. !51,19
  34.  
  35. !51,20
  36.  
  37. !51,23
  38.  
  39. !51,12
  40.  
  41. !51,14
  42.  
  43. !51,13
  44.  
  45. !51,9
  46.  
  47. !51,11
  48.  
  49.